Sunday, November 7, 2010

The Flam Railway


The Flåm Railway is one of the worlds steepest railway lines on normal gauge. The gradient is 55/1000 on almost 80% of the line, i.e. a gradient of one in eighteen. The twisting tunnels that spiral in and out of the mountain are manifestations of the most daring and skilful engineering in Norwegian railway history. It took 20 years to complete and connects the Oslo - Bergen railway line to the Sognefjord.



The train journey provides some of Norway's wildest and most magnificent scenery. On the 20 km-long train ride you can see rivers that cut through deep ravines, waterfalls cascade down the side of steep, snow-capped mountains and mountain farms cling dizzily to sheer slopes.

The most time-consuming work when constructing the railway line was on the tunnels. These were excavated manually. Only two of the twenty tunnels, which have a total length of 6 km, were excavated using machines. Every metre of tunnel cost the labour force, the navvies, up to a month's hard work. The labour force, 120 strong at the outset, rapidly increased to 220.

The steep mountainsides were a major challenge, the solution being to build hairpin tunnels in order to equalise the big differences in altitude on the steep mountain. The danger of avalanches and rock falls also constituted a problem. To avoid these hazardous stretches, the line crosses the river and valley three times during the journey, but it does not cross the river on bridges. Instead, the river is led through the mountain in tunnels underneath the railway line.






One can also check out the Flam Museum to understand the history of this engineering marvel.



No comments:

Post a Comment